Total Nigeria
Total Nigeria
During Q3 of 2018, CSS Venus supported Total Nigeria on the Shutdown of the AKPO FPSO. The deep-water Akpo field, is located more than 100 km offshore Nigeria and was brought onstream in March 2009. The field's water-depths are ranging from 1,300 m to 1,450 m